News

2017-05-23

Successful Installation

Permits from the United States Coast Guard (USCG), United States Army Corps of Engineers (USACE) and an exemption from the Florida Department of Environment Protection have […]
2017-04-02

Florida test site set

The team has chosen Fort Pierce, Florida as its test site location. The city has sufficient infrastructure for the technology development while being just out enough […]
2017-03-30

Pre-Seed Round Completed

The company announces that its pre-seed round is now closed with a local group of investors (undisclosed amount). The goal of the round is to set […]
2017-03-11

Design completed for the 4th generation system

A new anchoring system shall improve drastically the performance of the unit. The engineering team also ruggedized the buoy substantially with a design that should withstand […]
2016-11-12

Oneka completes its 3rd generation unit testing

The third generation testing has been completed with great results. The team gathered a lot of data about the different flows, pressures and power converted from […]
2016-08-05

3rd generation unit ready for deployment

The third generation unit is now ready for its deployment out in Scarborough beach, Maine. The team is planning a few months testing before the winter. […]
2016-07-19

Telemetry system ready

The data communication system is now ready for deployment. The engineering team is glad to announce that it will now have access to over 24 channels […]
2016-06-03

Oneka participates to the CaribDa 2016 Biennial Conference & Exposition, Trinidad & Tobago

From May 31 until until June 3rd, Oneka has participated to the CaribDa 2016 Biennial Conference and Exposition. The event gathers many important stakeholders in the […]
2016-06-02

Oneka Technologies wins OJIQ 2016 Grand Prize

The OJIQ  2018 Awards Ceremony: Oneka Technologies’ Renaud Lafortune and Dragan Tutić win the LOJIQ Grand Prix for their participation in the promotion of Quebec During […]
Get a Quote >