Successful Installation
Permits from the United States Coast Guard (USCG), United States Army Corps of Engineers (USACE) and an exemption from the Florida Department of Environment Protection…
A new anchoring system shall improve drastically the performance of the unit. The engineering team also ruggedized the buoy substantially with a design that should withstand waves of over 3m of height.