Successful Installation
Permits from the United States Coast Guard (USCG), United States Army Corps of Engineers (USACE) and an exemption from the Florida Department of Environment Protection…
The second-generation unit has been designed from scratch following the first-generation unit installed in late 2014. It is now a hydraulic system that only uses seawater as a hydraulic fluid and a much lighter structure for easier installation. The most important milestone achieved is the installation facility cost reduction of 80% compared to the previous version There are still many improvements to be brought to the technology to facilitate its development, such as the data transition device and data collection. It will be a great tool to increase the pace of development of the device.