Design completed for the 4th generation system
A new anchoring system shall improve drastically the performance of the unit. The engineering team also ruggedized the buoy substantially with a design…
The company announces that its pre-seed round is now closed with a local group of investors (undisclosed amount). The goal of the round is to set a permanent test site to have units deployed all-year long and to achieve a solid water production performance with the next generation unit.